Piston Ring 1.6 Liter Engine Original Peugeot - Citroen - N Auto Express
-30%
PSA GROUP

Piston Ring 1.6 Liter Engine Original Peugeot - Citroen

1,383.96 EGP
969.00 EGP متوفر غير متوفر
إعلامى عندما تكون متاحة
كود الصنف: P0640R5

توصيل خلال 1-4 أيام

منتج أصلي 100%

ضمان 3 شهور/ 10،000 كيلو عند التركيب فى فروع ان اوتو

  • وصف
  • سياسة الشحن
  • التعليقات

Piston Ring Original Peugeot

1.6 Liter Engine

  • PEUGEOT 306 Hatchback (Year of Construction 01.1993 - 10.2003)
  • PEUGEOT 306 Convertible (Year of Construction 01.1994 - 04.2002)
  • PEUGEOT 306 Saloon (Year of Construction 04.1993 - 10.2003)
  • PEUGEOT 405 II Estate (4E) (Year of Construction 08.1992 - 10.1998)
  • PEUGEOT 405 II Saloon (4B) (Year of Construction 01.1992 - 11.1999)
  • PEUGEOT 106 II Hatchback (1A, 1C) (Year of Construction 04.1996 - 05.2005)
  • PEUGEOT Partner I Van (Year of Construction 04.1996 - 12.2015)
  • PEUGEOT Partner I Combispace (Year of Construction 05.1996 - 12.2015)
  • PEUGEOT 206 Hatchback (2A/C) (Year of Construction 08.1998 - 12.2012)
  • PEUGEOT 306 Estate (Year of Construction 06.1994 - 04.2002)
  • PEUGEOT 206 CC (2D) (Year of Construction 09.2000 - 12.2008)
  • PEUGEOT 307 Hatchback (3A/C) (Year of Construction 08.2000 - 12.2012)
  • PEUGEOT 307 SW (3H) (Year of Construction 03.2002 - 12.2009)
  • PEUGEOT 206 SW (2E/K) (Year of Construction 07.2002 - ...)
  • PEUGEOT 307 CC (3B) (Year of Construction 10.2003 - 06.2009)
  • PEUGEOT 307 Estate (3E) (Year of Construction 03.2002 - 12.2009)
  • PEUGEOT 1007 Hatchback (Year of Construction 04.2005 - ...)
  • PEUGEOT 207 Hatchback (Year of Construction 02.2006 - 12.2015)
  • PEUGEOT 206 Saloon (Year of Construction 03.2007 - ...)
  • PEUGEOT 308 I Hatchback (4A, 4C) (Year of Construction 09.2007 - 12.2016)
  • PEUGEOT 207 SW (Year of Construction 02.2007 - 12.2013)
  • PEUGEOT Partner II Tepee (Year of Construction 04.2008 - ...)
  • PEUGEOT Partner II Van (Year of Construction 04.2008 - ...)
  • PEUGEOT 308 I SW (4E, 4H) (Year of Construction 09.2007 - 10.2014)
  • PEUGEOT Hoggar Pickup (Year of Construction 05.2010 - ...)
  • PEUGEOT 207 Saloon (Year of Construction 12.2007 - 12.2014)
  • PEUGEOT 307 Saloon (Year of Construction 01.2001 - 12.2012)
  • PEUGEOT 208 I Hatchback (CA_, CC_) (Year of Construction 03.2012 - ...)
  • CITROËN Saxo Hatchback (Year of Construction 02.1996 - 04.2004)
  • CITROËN Berlingo / Berlingo First I Van (M) (Year of Construction 07.1996 - 12.2011)
  • CITROËN Berlingo / Berlingo First I (MF, GJK, GFK) (Year of Construction 07.1996 - 12.2011)
  • CITROËN Xsara Hatchback (N1) (Year of Construction 04.1997 - 12.2005)
  • CITROËN Xsara Estate (N2) (Year of Construction 10.1997 - 03.2010)
  • CITROËN Xsara Coupe (N0) (Year of Construction 01.1998 - 04.2005)
  • CITROËN Xsara Picasso (N68) (Year of Construction 12.1999 - 06.2012)
  • CITROËN C3 I Hatchback (FC, FN) (Year of Construction 02.2002 - ...)
  • CITROËN C3 Pluriel (Year of Construction 05.2003 - ...)
  • CITROËN C2 Hatchback (JM) (Year of Construction 09.2003 - 09.2017)
  • CITROËN C4 Coupe (Year of Construction 11.2004 - 07.2011)
  • CITROËN C4 I Hatchback (Year of Construction 11.2004 - 07.2011)
  • CITROËN Berlingo II (B9) (Year of Construction 04.2008 - ...)
  • CITROËN Berlingo II Van (B9) (Year of Construction 04.2008 - ...)
  • CITROËN C3 Picasso (Year of Construction 02.2009 - ...)
  • CITROËN C3 II (SC) (Year of Construction 11.2009 - ...)
  • CITROËN C4 I Saloon (Year of Construction 07.2006 - ...)
  • CITROËN C4 II Hatchback (Year of Construction 11.2009 - ...)
  • CITROËN C4 Aircross (Year of Construction 08.2010 - ...)
  • CITROËN C3 Aircross I (Year of Construction 06.2013 - ...)

سياسة التوصيل والشحن

شكرًا لك على الشراء من موقع ان اوتو اكسبريس .

فيما يلي الشروط التي تشكل سياسة الشحن/عملية التسليم لدينا:

  • خدمة التوصيل متاحة فقط للطلبات التي لها عناوين توصيل داخل القاهرة الكبرى والإسكندرية
  • قد تؤدي المعاملات المتعددة إلى ترحيلات متعددة إلى كشف الحساب الشهري لحامل البطاقة.

وقت معالجة الشحنة

تقوم شاحنات الخدمة لدينا باستلام طلبك وتسليمه خلال 48 ساعة بعد تقديم طلبك. إذا كنا نواجه حجمًا كبيرًا من الطلبات، فقد تتأخر الشحنات لبضعة أيام. إذا كان هناك تأخير كبير في شحن طلبك، فسنتصل بك عبر البريد الإلكتروني أو الهاتف.

بالنسبة لشركائنا في شركات النقل، يرجى الانتظار لمدة 2:4 أيام عمل لاستلام طلبك.

 

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

تسوق و استمتع

ستة اشهر بدون اي مصاريف او فوائد

اشتر الأن ادفع لاحقا

حلول تمويلية متعددة

شوهد مؤخرا

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)